View Details
Bid Classification: |
Construction
|
---|---|
Bid Type: | Tender |
Bid Number: | 1-2020 |
Bid Name: | Cameron Street Reconstruction |
Bid Status: | Awarded |
Bid Awarded Date: | Mon Feb 10, 2020 (EST) |
Published Date: | Mon Dec 9, 2019 11:15:00 AM (EST) |
Bid Closing Date: | Tue Jan 21, 2020 1:00:00 PM (EST) |
Question Deadline: | Thu Jan 9, 2020 1:00:00 PM (EST) |
Electronic Auctions: | Not Applicable |
Language for Bid Submissions: | English unless specified in the bid document |
Submission Type: | Online Submissions Only |
Submission Address: | Online Submissions Only |
Public Opening: | No |
Description: |
* Electronic Submissions Only *
The Corporation of the City of Sarnia 255 Christina St. North Sarnia, Ontario N7T 7N2 Description of Project: · Includes combined sewer separation · Supply and install temporary watermain · Supply and install approximately 750 m of 600 mm to 300 mm diameter storm and sanitary sewer · Supply and install approximately 380 m of 150 mm diameter watermain · Supply and install approximately 5,000 tonnes of Granular “BII” · Supply and install approximately 2,000 tonnes of Granular “A” · Supply and install approximately 1,100 tonnes of asphalt paving · Supply and install approximately 780 m of concrete curb and gutter, · Supply and install approximately 1,100 sq. m of concrete sidewalk Proponent Conditions: All Proponents submitting to the noted project are required to have all the required documents as per the specifications including but not limited to:
· Certificate of Liability Insurance · WSIB Clearance Certificate or equivalent · WSIB CAD7 Report or equivalent · Bid Securities and Bonding This Procurement activity may be subject to the terms of the Canadian Free Trade Agreement and other trade agreements. |
Bid Document Access: | Bid document preview, bid opportunity, and award notices are available on the site free of charge. Suppliers are not required to register for a bid opportunity prior to previewing unsecured bid documents. Please note, some documents may be secured and you will be required to register for the bid to download and view the documents. To obtain an unsecured version of the bid document and/or to participate in this opportunity, an annual or a per bid fee must be paid (annual fee - $461.90, per bid fee - $138.64). |
Categories: |
Show Categories [+]
|
Awarded Summary
Proponent |
Cost including Non-rebateable HST |
2044970 Ontario Inc. (All Seasons Excavating) |
$1,826,727.08 |
Van Bree Drainage and Bulldozing |
$1,966,642.66 |
Bre-Ex Construction |
$2,023,669.94 |
Cope Construction |
$2,042,385.79 |
J-AAR Excavating Limited |
$2,154,103.30 |
Henry Heyink Construction |
$2,243,808.00 |
Birnam Excavating |
$2,523,628.30 |